Flashback with pics of an horizontal Pelton Turbine of 3.2 MW installed in an hydroelectrical plant in New Caledonia and commissioned early 2021.
Scope of supply:
– Inlet Valve
– Turbine
– Generator
– HPU
Net head : 498.8 m
Discharge : 0.71 m³/s
Turbine rated speed : 1000 rpm
Pelton diameter : Ø 919 mm
3D Design
Manufacturing in our french workshop
Assembly of the injectors and runner
Installation and commissioning of the plant
View of the ocean from the site
A challenging rehabilitation project starts for HPP in Belgium.
It consists of the refurbishment of two of the three units of 4 MW each.
The first step is a full-scale 3D scan of the power plant.
Below the pictures compared with their 3D result.
Design of the two horizontal Francis turbines can now start.
HPP adquiere las actividades y los activos de Hydreo.
Hydreo diseña, fabrica e instala equipos hidromecánicos a través el mundo entero (compuertas, rejas, rejillas, “log boom” de protección, válvulas de compuerta, válvulas, compuertas de esclusa etc…).
Los 48 000 metros cuadrados de la fábrica están a menos de una hora de la oficina de HPP, en Francia (1,5 hora de Paris).
“El objetivo de la recuperación es simple: crear un actor francés importante en la hidro con la doble competencia: hidromecánicos (Hydreo) y turbinas (HPP). Con todo el equipo diseñado y fabricado en Francia, el grupo HPP realiza proyectos a través del mundo entero.” Pierre Pisterman